Wyszukiwanie

Germany

Lauterbach

Sawn & profiled timber
Pellets
Green power
Pallet blocks

Pfeifer began in 2008 on an area of 50 hectares in the Hessian Lauterbach with the complete new construction of a fully integrated production site. Also in Lauterbach 100% of delivered round timber is processed. Until now Pfeifer has invested around 150 millions Euros in the modern plant. 

Our product fields

In Lauterbach we produce sawn timber, pallet blocks, wood pellet and green power that is fed into the public power network. An highly efficient saw line with a

processing quantity up to 40 trunks per minute

clearly shows the size of the material supply. It lies also in Lauterbach in our own hands.

Product fields and year capacities in Lauterbach

Contact
Pfeifer Holz Lauterbach GmbH Am Hällstein 1
D-36341 Lauterbach

Phone: +49 6641 911 840
info@pfeifergroup.com
UID: DE261016492

Apply now to the Pfeifer Group in Lauterbach

Use our practical online application or send us your individual documents.

SITE

Lauterbach

Yearly capacities:
Sawn timber & profiled timber: 620,000 m³
Composite pallet blocks: 230,000 m³
Wood pellets: 75,000 t
Green power: 80 millions kWh

Production at the plant since 2009
Employees: 250

2008
Starting signal on the
green meadow

With the ground breaking for the new Lauterbach site comes also the starting signal of the largest single investment in the company history of the Pfeifer Group.

2009
Off it goes

After a bit more than a year time, Pfeifer is able to put the factory into operation.

2012
New product

Also in Lauterbach begins the pellet production. Further drying chamber are put into operation.

2015
Success with pellets

A second pellet silo with 9,000 tonnes of storage capacity is put into operation.

2019
On the upswing

Extension of chip preparation and chip drying. Log production is also being expanded.

2021
Investments

Extension and optimisation of timber drying by a channel tunnel dryer. In addition, a new sorting scanner and an automatic enclosure will be put into operation.

2022
A milestone for logistics

The factory's own railway siding will go into operation in April. After a construction period of almost one and a half years, the large-scale project, which costs 16 million euros, is supporting the long-term supply security of the site with the raw material wood.

2023
Modern efficiency

Introduction of the "digital log yard" with sorting optimisation software for the optimal use and control of the log yard.